These two might look like they are biting chunks out of each other but its their way of showing what good friends they are. Trevor would like to get in on the act but lacks the reach. Not quite sure what he thinks he will achieve that end.
Stable Sprite came round today and surveyed the demolition site. He thinks he can rebuild it, he has the technology, and when he does Rock HQ will be better than it was before, better, stronger, faster, Rock HQ will be the first bionic smallholding.
Not quite.
But it will have a new entrance, two deluxe kennel rooms, a boot room/locker room and another store room. It will also feature something very unusual in these parts, a level floor. Stable Sprite likes level floors. The floor I laid for the stable wasn't level which vexed him mightily. So to keep him sane I have agreed a level floor. Work starts next week. Coincidentally when I go back to work. I think he was trying to tell me something!
No comments:
Post a Comment