You missed a bit

The bathroom project is nearly finished … after 3 years we now have an operational bathroom where the toilet isn't in the middle of the room and in danger of falling over and the shower empties down the drain not into the living room. There are still a few bits that need doing, another box of tiles is needed to finish around the window and the radiators need refitting. Oh and the bath taps need fixing to the floor. Plus two more blinds need hanging, a bit of grouting, the light switch refitting and the toilet pipe boxed off. Not forgetting the architrave around the door. And a lock. Apart form that its all done.