The digger arrived today and negan some minor alterations to Rock HQ. Ground level by the kennel was lowered and the lane to the cauldron was raised. I did try and move the concrete block retaining wall but gave up after an hour with the sledge hammer failed to break Karls handiwork. This came as a complete surprise as most of the things he built fell apart shortly after he left so why the wall should remain intact after the attention of Mr Sledge is a mystery
The cleared area is going to be the horse corral.
Tuesday, 3 August 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment